Contact DR. DEWPOINT ℠ 24/7/365
Send message
Direct Reaction Team
We are ready to respond on short notice to ensure that real estate and other property restored to its origins in the fastest possible way. We do a quick assessment of the damage to be able to take the right actions.
Contact our US office
Polygon US Headquarters15 Sharpner’s Pond Road, Building F North Andover, MA 01845Phone: 1-800-422-6379
See all our US locations here: Polygon US office locations
For global support, please contact one of our offices listed here: Our Global offices - Polygon Group
Thanks for your email, we will get back to you shortly!
I consent to Polygon collecting my personal information in order to contact me. Polygon handles all personal data according to the General Data Protection Regulation (GDPR)
Global
Austria
Belgium
Canada
Denmark
Finland
France
Germany
Italy
Luxembourg
Netherlands
Norway
Singapore
Sweden
Switzerland
United Kingdom
United States
Notice
You are now leaving Polygon Restoration's website and will be directed to another country in the group.Do you want to proceed?
When a large power company in Casa Grande, Arizona reconditioned two of their 740 Megawatt coal fired power plant units, Polygon provided dehumidification, holding conditions at less than 30% throughout the maintenance lay-up of the two units. Polygon worked with the lay-up team to engineer this massive project from beginning to end. The team effectively brought the plant back online as scheduled.
Polygon provided temporary cooling for the retrofit of #1 and #2 turbines on a 900 Megawatt BWR Plant. Heat build-up during these shutdowns can create schedule delays due to the acclimation period for workers (as required by heat stress safety procedures). Polygon provided chillers and air handlers utilizing an elaborate labyrinth of duct to effectively cool the turbine floor, creating a safe and comfortable environment for plant personnel. In the end, the shutdown came in on schedule and under budget.
A 1,200 Megawatt PWR in Burlington, Kansas regularly utilizes Polygon to provide temporary dehumidification to lay up their generators. Polygon uses desiccant units to create an environment that eliminates the threat of corrosion in their turbine and generator units. This passivation procedure reduces costly maintenance and startup costs when the plant goes back on line. Polygon provides a complete turnkey package, ensuring stress-free and successful results.