Case Studies & Projects

Temporary Climate Solutions

Lock coating with lead abatement and climate control

The Okeechobee Inland Waterway connects the Atlantic Ocean with the Gulf of Mexico, allowing boats to pass through Florida from the city of Stuart on the east coast through Lake Okeechobee to Fort Myers on the west. Along this 152-mile waterway are five locks, which allow the vessels traveling through to ascend as much as 13 feet at a single lift. Along with navigation, the waterway has been built to provide Florida citizens with multiple benefits of reduced flood damage, environmental protection, and recreation.

Temporary Climate Solutions

Water disaster at LA Courthouse

Experts estimated that nearly one million gallons of water gushed out of a broken water main and across the first floor of the Los Angeles Federal Courthouse before it found its way to the building’s basement. When the flooding stopped, much of the first-floor office space was severely damaged and the 70,000-square-foot basement had four feet of standing water. Lower locations, such as the elevator shaft and the building power vault, had much deeper water. To make matters worse, the flood-damaged power vault housed transformers that supplied power to the city for blocks around.

Temporary Climate Solutions

National Aquarium requires 20deg dewpoint for tank fix

After several years of wear, the coatings on two of the famous tanks at the National Aquarium failed, allowing seawater to penetrate the concrete. The project specified a coatings system that was tricky due to the harsh application conditions.

Temporary Climate Solutions

Data center pipe break threatens equipment

“It’s hard to imagine $100 million of computer equipment; but should you stand at one end of our computer center, you can barely see the other side.” That’s how Ted Turner, Hewlett Packard facility manager, described the new Atlanta operations center.

Temporary Climate Solutions

Water damage threatens Florida Hilton Hotel opening

When thousands of gallons of water flooded the new 1,400-room Hilton Hotel in Orlando, Florida, it was like a scene from a nearby water park in the popular Florida resort area. With plans to complete the hotel’s construction Hilton faced a very tight schedule but fast action and expert drying by Polygon assured that the construction schedule proceeded as scheduled.