Case Studies & Projects

Temporary Climate Solutions

Preserving priceless art with climate control

With 120 of the world’s most valuable art objects at stake, the government of Portugal was not willing to take any chances with humidity control when it lent the exhibit to the prestigious San Diego Museum of Art. Priceless pieces included several paintings of 18th-century Lisbon, fine silver, elaborate furniture, porcelain, unusual scientific instruments, and spectacular selections from the Portuguese crown jewels. Rare religious items included silk vestments from the Lisbon Cathedral, precious altar furnishings in both gold and silver and a spectacular gilded wood altarpiece that measured over 22 feet high.

Temporary Climate Solutions

Repairing stadium water damage days away from playoffs

Just days before the 2001 playoffs, Tennessee Titans management was thrown for a loss when a pipe break at Adelphia Stadium flooded more than 200,000 square feet of interior space. The high-pressure water main spilled an estimated 50,000 gallons onto the 150,000 sq. ft. fourth-level club area. The water rained down on other facilities, including radio network offices, administrative offices, and a post-game interview room.

Temporary Climate Solutions

Expediting cure times with dehumidification in hospital construction

Nothing can be as frustrating for a building contractor as watching building materials such as concrete and wallboard slowly dry when the clock is ticking against the project’s deadline. Such was the situation faced by Robins & Morton, one of the largest healthcare contractors in the nation.

Temporary Climate Solutions

Restoring the Superdome after Hurricane Katrina

In response to Hurricane Katrina, Polygon marshaled the largest recovery team in its 20+ year history. More than 85 projects in greater New Orleans and the Mississippi Gulf Coast were handled in a four-month effort. One of the projects Polygon served was the Superdome, which served as a last resort refuge for about 25,000 to 30,000 people during the storm.

Temporary Climate Solutions

Speed up construction schedule with concrete drying

Construction drying is vital in times of need, especially when running on a tight schedule. Best Buy's Portland retail store found themselves in this exact situation when construction issues threatened their project schedule.

We are here to help

Connect with our team today