A 1,200 Megawatt PWR in Burlington, Kansas regularly utilizes Polygon to provide temporary dehumidification to lay up their generators.
Polygon used desiccant units to create an environment that eliminates the threat of corrosion in their turbine and generator units. This passivation procedure reduces costly maintenance and startup costs when the plant goes back online. Polygon provides a complete turnkey package, ensuring stress-free and successful results.