Power Plant Reconditioning

When a large power company in Casa Grande, Arizona reconditioned two of their 740 Megawatt coal-fired power plant units, they needed to ensure proper conditions throughout the project.

Polygon deployed a dehumidification system able to hold conditions at less than 30% throughout the maintenance lay-up of the two units. Polygon worked with the lay-up team to engineer this massive project from beginning to end. The team effectively brought the plant back online as scheduled.