Case Studies & Projects

Temporary Climate Solutions

Generator Lay Up

A 1,200 Megawatt PWR in Burlington, Kansas regularly utilizes Polygon to provide temporary dehumidification to lay up their generators.

Temporary Climate Solutions

Temporary Cooling During a Retrofit

Polygon provided temporary cooling for the retrofit of #1 and #2 turbines on a 900 Megawatt BWR Plant. Heat build-up during these shutdowns can create schedule delays due to the acclimation period for workers (as required by heat stress safety procedures).

Document Recovery Solutions

Saving Chinese history post-fire at MOCA

In 2020, a devasting fire affected the Museum of Chinese in America in Manhattan's Chinatown, known as MOCA. At risk was a collection of 85,000 sculptures, textiles, photos and other rare historical artifacts. It took many people, companies, and volunteers to recover what items were salvageable. Polygon was honored to be a part of that team.

Document Recovery Solutions

Department of Veteran Affairs

The Department of Veterans Affairs goes to great lengths to protect their patients' information and mandates extra security measures when handling their documents. Polygon was happy to assist the VA in Minneapolis when it needed help with documents and requested our team to work under the direct supervision of a VA staff member.

Document Recovery Solutions

Amherst College Pipe Burst

Amherst College houses some of the most important historic documents of old New England. When the pipes burst during a deep winter freeze and thousands of vital papers, documents and books were damaged, Polygon showed up.

We are here to help

Connect with our team today