Case Studies & Projects

Temporary Climate Solutions

Humidity puts peanut production at risk

Clint Williams Co. is one of the nation’s largest processors and exporters of peanuts. At its Oklahoma site, Clint Williams can grade, process, and store up to 18 million pounds of unshelled peanuts or 36 million pounds of shelled peanuts. From the moment the peanuts arrive at the facility to when they are exported their moisture content is highly monitored and vital to their success. When facing high levels of humidity in the summer the quality of millions of peanuts were at risk.

Temporary Climate Solutions

Target Field construction at risk due to humidity

Climate control expert Polygon stepped up to the plate to assure that the high-end millwork that adorns the indoor sections of Target Field, the new home of baseball’s Minnesota Twins, will be a hit with fans when the ballpark opens.

Temporary Climate Solutions

Preserving priceless art with climate control

With 120 of the world’s most valuable art objects at stake, the government of Portugal was not willing to take any chances with humidity control when it lent the exhibit to the prestigious San Diego Museum of Art. Priceless pieces included several paintings of 18th-century Lisbon, fine silver, elaborate furniture, porcelain, unusual scientific instruments, and spectacular selections from the Portuguese crown jewels. Rare religious items included silk vestments from the Lisbon Cathedral, precious altar furnishings in both gold and silver and a spectacular gilded wood altarpiece that measured over 22 feet high.

Temporary Climate Solutions

Repairing stadium water damage days away from playoffs

Just days before the 2001 playoffs, Tennessee Titans management was thrown for a loss when a pipe break at Adelphia Stadium flooded more than 200,000 square feet of interior space. The high-pressure water main spilled an estimated 50,000 gallons onto the 150,000 sq. ft. fourth-level club area. The water rained down on other facilities, including radio network offices, administrative offices, and a post-game interview room.

Temporary Climate Solutions

Expediting cure times with dehumidification in hospital construction

Nothing can be as frustrating for a building contractor as watching building materials such as concrete and wallboard slowly dry when the clock is ticking against the project’s deadline. Such was the situation faced by Robins & Morton, one of the largest healthcare contractors in the nation.

We are here to help

Connect with our team today