Case Studies & Projects

Temporary Climate Solutions

Petrochemical tank coating time cut in half

Houston Fuel Oil needed to meet a deadline to store incoming crude oil, their painting contractor was challenged to complete two tanks within 28 days, versus a normal 60-day schedule. This demanding schedule had to be met during a cool, rainy period, which was likely to create condensation on the work surface of the tank.

Temporary Climate Solutions

Power Plant Reconditioning

When a large power company in Casa Grande, Arizona reconditioned two of their 740 Megawatt coal-fired power plant units, they needed to ensure proper conditions throughout the project.

Temporary Climate Solutions

Bill Gates Foundation World Headquarters - Iris Campus

With very little space in the yard and no space on the curbs outside to place equipment, logistical creativity was a must for the two large Iris Campus buildings of the Bill Gates Foundation World Headquarters.

Temporary Climate Solutions

Helix Water tank coating in dangerous summer heat

A four-million-gallon Helix Water District water storage tank was scheduled to have an old coating of lead-based paint removed from its roof and support structure. The advent of summer also threatened to cause dangerously high temperatures inside the tank, creating worker safety concerns.

Temporary Climate Solutions

Temperature control for Yale Beineke Library

Temperature and humidity controls ensure that stored materials are protected for future generations. For the Beinecke Rare Book & Manuscript Library, it has become more difficult over the years, especially since the building was built in 1960, which means maintenance is much more difficult. Polygon was tasked with controlling the internal temperature levels without compromising the building structure.