Kaiser Permanente Hospital Dehumidification
Polygon and the Contractor utilized a sheet metal ducting and stack system to deliver dehumidified air onto each floor of the Kaiser Permanente Hospital.
Notice
You are now leaving Polygon Restoration's website and will be directed to another country in the group.
Do you want to proceed?
Polygon and the Contractor utilized a sheet metal ducting and stack system to deliver dehumidified air onto each floor of the Kaiser Permanente Hospital.
A 1,200 Megawatt PWR in Burlington, Kansas regularly utilizes Polygon to provide temporary dehumidification to lay up their generators.
Polygon provided temporary cooling for the retrofit of #1 and #2 turbines on a 900 Megawatt BWR Plant. Heat build-up during these shutdowns can create schedule delays due to the acclimation period for workers (as required by heat stress safety procedures).
Houston Fuel Oil needed to meet a deadline to store incoming crude oil, their painting contractor was challenged to complete two tanks within 28 days, versus a normal 60-day schedule. This demanding schedule had to be met during a cool, rainy period, which was likely to create condensation on the work surface of the tank.
When a large power company in Casa Grande, Arizona reconditioned two of their 740 Megawatt coal-fired power plant units, they needed to ensure proper conditions throughout the project.
Emergency Support
1-800-422-6379Send an email
us_info@polygongroup.com24/7 Hotline
Urgent equipment and operational support
Property damage
Documents and contents damage
24/7 Emergency:
United States: 1-800-422-6379
Canada: 1-888-702-4782
Your questions and comments are important to us. Please send us your information with a description of your needs and we will connect with you promptly.
Polygon US Headquarters
15 Sharpners Pond Road, Building F North Andover, MA 01845
Phone: 1-800-422-6379
See all our US locations here: Polygon US office locations
For global support, please contact one of our offices listed here: Our Global offices - Polygon Group