Case Studies & Projects

Temporary Climate Solutions

Power Plant Reconditioning

When a large power company in Casa Grande, Arizona reconditioned two of their 740 Megawatt coal-fired power plant units, they needed to ensure proper conditions throughout the project.

Temporary Climate Solutions

Bill Gates Foundation World Headquarters - Iris Campus

With very little space in the yard and no space on the curbs outside to place equipment, logistical creativity was a must for the two large Iris Campus buildings of the Bill Gates Foundation World Headquarters.

Temporary Climate Solutions

Helix Water tank coating in dangerous summer heat

A four-million-gallon Helix Water District water storage tank was scheduled to have an old coating of lead-based paint removed from its roof and support structure. The advent of summer also threatened to cause dangerously high temperatures inside the tank, creating worker safety concerns.

Temporary Climate Solutions

School construction in hot summer months

While deadlines and project details may always seem tight, none seem tighter than those concerning school construction projects. Schools must follow environmental regulations during renovations and new construction to keep students and faculty safe from potential health risks. New masonry construction began at MacArthur Elementary School in New York during the summer, including the gymnasium, library, and three two-story classroom wings. With construction costs near $80,000,000, interior conditions must be maintained during construction to meet design specifications and stay on schedule.

Temporary Climate Solutions

Pearl Harbor Memorial Bridge climate control

Scheduled for completion by 2016, Pearl Harbor Memorial is a 10-lane bridge. One of the first extra-dosed cable-stayed bridges constructed in the U.S., it is the centerpiece of a $2.2 billion mega-project to reconstruct and widen 7.2 miles of I-95 in Connecticut between West Haven and Branford.

We are here to help

Connect with our team today