Case Studies

Climate and Digital Solutions

Onsite Construction Solutions for Drying Rooms

On your construction site an effective drying room is essential. After working in the cold and wet, who wants to put on damp clothes? Despite all your best efforts, it can be difficult to find a solution to make your drying room as comfortable for your employees as you would like. So how do you create the ideal drying room for your team?

Climate and Digital Solutions

Keeping Stranraer Academy’s Hydrotherapy Pool Running

Stranraer Academy, established over 175 years ago in South West Scotland, supports nearly 1,000 pupils, including those with Severe and Complex Learning Difficulties. It's AIRD Centre offers specialist facilities such as teaching areas, a multi-sensory room, and a hydrotherapy pool, crucial for supporting the physical and mental wellbeing of both pupils and private clients.

Climate and Digital Solutions

Polygon provides the correct environmental conditions to enable water tank repair

When a water tank has a capacity of more than 4,000 cubic litres, maintaining its structural integrity is a key priority. Fail to do so and there is the potential for significant water damage and costly repairs. When looking to maintain an underground water tank of this scale at a rural site, the structural engineering contractor engaged Polygon’s specialist help to ensure very specific environmental parameters were met.

Climate and Digital Solutions

Dumfries Ice Bowl

Curling may still be considered a niche sport, but its popularity has grown significantly, particularly following its prominent role in the 2022 Winter Olympics. The Dumfries Ice Bowl in Scotland, which proudly welcomed Team GB’s medal-winning curlers home from Beijing, regularly hosts elite-level events such as the Scottish and English Curling Championships. For competitions of this calibre, the quality of the ice is critical. Even slight fluctuations in temperature or humidity can compromise the playing surface, leading to melting or crystallisation that can affect gameplay.

Climate and Digital Solutions

Calton Road Rail Bridge

Originally built in 1896, the Calton Road rail bridge plays a vital role in Edinburgh’s transport network, carrying trains in and out of Waverley Station—one of Scotland’s busiest rail hubs. In January 2022, Network Rail launched a £1.7 million refurbishment project to repair and re-paint the bridge, protecting the structure from long-term weathering. A critical part of this work was ensuring the paint application met stringent quality standards, as any failure in the finish due to poor environmental conditions would require a costly and disruptive rework, especially problematic in such a high-traffic city centre location.

Call us today on

Subscribe to our mailer list

Thank you for your submission

Unfortunately, something went wrong

Please try again

By subscribing to our mailer list you are agreeing to receive information from Polygon UK.


We work in accordance to GDPR legislation. We will only use your personal data to communicate with you through our newsletters or to inform you about products, services or promotional offers that you might find interesting if you have chosen to receive these types of communications. We will never give your information to third parties. The data is stored in Mailchimp.


You can unsubscribe at any time from our mailer list via a link at the bottom of the newsletter or email that you receive from Polygon UK.