Efficient Climate Control for Winter Tank Refurbishment
Due to tank dimensions equal to 22,911 m2 and the project running through the middle of winter, this was a large-scale project. Site location and terrain, although beautiful, were difficult to get to, and installation of our equipment on a reasonable lay-down area to ensure proper delivery of the processed and heated air to the tank presented its challenges. Our Technicians worked hard and managed to site the equipment in an accessible area and close enough to the target area for the processed air not to be affected by lengthy ducting distances.